The sintered stone manufacturing process converts a prepared mineral powder into a dense slab through compaction, drying, roller-kiln firing near 1,200°C, and controlled cooling. For wholesale and OEM procurement, qualify the production lot using finished dimensions, flatness, water absorption, flexural results, and a representative cut trial. Press force and kiln temperature are process inputs. The inspection records show how the finished slab performs.

Powder preparation → Compaction → Firing and cooling → Lot release

Raw Materials and Powder Preparation

Clay, Feldspar, and Silica

Kaolinitic clay contributes to the unfired body's handling strength and supplies alumina and silica. Feldspars supply alkalis that promote formation of a liquid phase during firing. Quartz, a crystalline form of SiO2, contributes to the mineral framework, and some of it can remain in the fired slab. The balance among the liquid phase, residual minerals, and newly formed phases affects densification and deformation at firing temperature.

Wet Grinding and Spray Drying

A wet grinding ball mill reduces and disperses the mineral blend in water to form a slip. After spray drying, the resulting granules feed the compaction line. Record slip solids, milling residue at a stated sieve size, granule-size distribution, and powder moisture. A single average moisture reading can conceal variation across a hopper or powder bed. For recurring slab orders, retain the powder-batch identifier with the compaction and firing records so a change in caliber or flatness can be traced back to the feed. DF's factory overview identifies ball milling, spray preparation, pressing, drying, and firing in the production sequence.

SACMI Compaction and the 10,000-Tonne Force Rating

Hydraulic Die Pressing and Continua+ Roller Compaction

SACMI lists the PH10000 hydraulic press at 10,000 metric tonne-force, approximately 98.1 MN, with a 2,450 mm machine gap. To estimate average die pressure, divide the applied force by the loaded die area. For example, 98.1 MN over a hypothetical 2.50 m² die area gives 39.2 MPa. The actual calculation requires the applied force and loaded area for the production setup.

The SACMI Continua+ continuous pressing system uses a PCR roller compactor. Two driven belts and a roller assembly progressively compact the moving powder bed. For a Continua+ audit, record the machine configuration, line speed, powder-bed consistency, and green thickness and density across the working width. DF identifies Continua+ in its production overview. The PH10000 rating is a separate equipment reference. See the production sequence in the DF Sintered Stone Factory Overview.

Compaction Systems and Audit Records
Procurement Check SACMI PH10000 Hydraulic Press SACMI Continua+ PCR Compactor
Load Application Applies hydraulic force to a defined die area during a press cycle. Driven belts and rollers compact a moving powder bed.
Machine Data Model, applied force in kN, loaded die area in m², and cycle settings. PCR model, line speed in m/min, powder-bed settings, and compaction geometry.
Green-Body Checks Compare thickness and density across the pressed piece. Compare thickness and density at left, center, and right, and at intervals along the run.
Finished-Slab Checks Map shrinkage and caliber by lot. Map longitudinal and transverse shrinkage. Check finished caliber and flatness by lot.

Request DF Slab Samples and Technical Data Sheets

Send Xiamen East Phenix the slab code, thickness, finish, and intended use. Request the applicable absorption and flexural reports, a dimensional inspection sheet, and a sample from the proposed lot for machining trials.

Roller-Kiln Firing Near 1,200°C

Densification and Hot Deformation

As the slab passes through the hot zone, a feldspar-derived liquid phase promotes densification and reduces open porosity. As the body softens, it can also deform under its own weight. This behavior, known as pyroplastic deformation, matters on wide or thin slabs where uneven heating or roller support can affect the finished shape. Published research on porcelain stoneware describes peak firing temperatures around 1,200–1,230°C. Treat that range as an industry reference and qualify the actual firing profile by body, thickness, and finish.

Audit Heating and Cooling Alongside Peak Temperature

Record kiln setpoints, line speed, and time through the hot zone. For a troubleshooting run, compare left, center, and right positions across the kiln and identify whether a temperature value comes from a zone sensor or a measured product-temperature profile. Track fired dimensions before rectification and final dimensions afterward. This preserves the shrinkage record and provides finished caliber for purchase-order acceptance.

Cooling gradients can leave residual stresses after firing. Glazed products also warrant a review of the thermal-expansion relationship between the body and glaze. When a slab passes flatness inspection but moves during cutting, compare its response with other slabs from the same lot and verify the cutting setup before assigning a cause.

Lot Release for Caliber, Flatness, and Cutting Response

Set Dimensional Limits and Test Methods on the Purchase Order

Define caliber as the declared finished size or agreed size band used to sort slabs. State nominal dimensions and allowable deviations in millimetres. Record thickness, edge straightness, and flatness separately, with support condition, measurement positions, and span specified. Use applicable EN ISO 10545-2 methods and document any agreed full-slab inspection procedure for the ordered format.

Lot Release Inspection Matrix
Release Item Method or Record Buyer Documentation
Caliber and Thickness EN ISO 10545-2, as applicable, and the purchase drawing. Nominal format, deviation limits, measurement positions, and actual readings.
Flatness and Warpage EN ISO 10545-2, as applicable, and the agreed full-slab procedure. Support condition, measurement span, and maximum deviation in mm.
Water Absorption and Bulk Density EN ISO 10545-3. Results by lot or qualified product configuration. Example purchase targets are ≤0.05% absorption and ≥2.40 g/cm³ bulk density.
Flexural Performance EN ISO 10545-4. Modulus of rupture in MPa and breaking strength in N. ≥50 MPa is an example modulus-of-rupture target, subject to product-specific evidence.
Thermal Shock and Chemical Resistance EN ISO 10545-9 and EN ISO 10545-13. Results for the selected finish. For chemical resistance, report the reagent category and applicable classification.
Cutting Response Buyer-approved strip or cutout trial. Slab ID, cut geometry, machine settings, post-cut movement, and crack or chip observations.

Run a Controlled Cut Trial on Representative Slabs

Mark the slab orientation, place the slab on a verified support bed, and record initial flatness. Use a wet 5-axis CNC bridge saw or abrasive waterjet to make the agreed strip or opening. Place the first internal tension relief cut in the perimeter waste where the slab procedure calls for it. For a waterjet opening, start the lead-in inside the waste. For a saw-cut opening with drilled stop holes, bring the straight cuts into the corner radii tangentially.

Photograph the cut and record strip curvature, kerf movement after the tool has passed, and crack location. Use the trial as a fabrication acceptance check. A quantitative residual-stress measurement requires a separate measurement method.

A published industry fabrication manual gives reference waterjet settings of 3,500–3,700 bar, with traverse rates of 1,000 mm/min for 12 mm and 700 mm/min for 20 mm. Its CNC crown-bit example lists 4,500–5,500 RPM at 10 mm/min. Its corner procedure specifies a minimum internal radius of 3 mm, equivalent to a 6 mm diameter stop hole where that drilling method applies. Qualify the actual settings and corner radius for the selected DF slab, thickness, tooling, and drawing. Record those values on the trial sheet and apply the shop's verified silica exposure controls.

Request DF Wholesale or OEM Pricing

Submit the required formats, thicknesses, finish codes, drawings, order volumes, and acceptance criteria to Xiamen East Phenix. For an FCL quotation, include the destination port and request written confirmation of MOQ, lead time, packing configuration, and the lot records included with the order.

Buyer FAQ

What does a 10,000-tonne SACMI press rating tell a slab buyer?

It represents approximately 98.1 MN of rated force on the SACMI PH10000 hydraulic press. Ask for the installed machine model and applied force. For die pressing, divide applied force by loaded die area to estimate average pressure, then review the lot's green-density and finished-slab inspection records.

How should I specify thickness and flatness for 1600 × 3200 mm slabs?

State the nominal 1600 × 3200 mm format and the ordered thickness, such as 12 mm. Set separate millimetre limits for thickness deviation and flatness. Define the support condition, measurement span, and sampling plan, then require the supplier to report actual readings against those limits before lot release.

When should I require a cutting trial for an OEM slab order?

Require a trial before releasing the first production lot for a new body, thickness, or finish. For a 20 mm countertop program, cut one representative strip and one drawing-specific opening, then record edge chipping, post-cut movement, and crack location. Agree on repeat sampling after a process change.